Implimentation of Just-in-time Production System: Building Blocks and Guiding Principles - Temesgen Garoma - Boeken - LAP LAMBERT Academic Publishing - 9783848448791 - 24 maart 2012
Indien omslag en titel niet overeenkomen, is de titel correct

Implimentation of Just-in-time Production System: Building Blocks and Guiding Principles

Temesgen Garoma

Prijs
€ 67,99

Besteld in een afgelegen magazijn

Verwachte levering 29 jul. - 8 aug.
Voeg toe aan uw iMusic-verlanglijst

Implimentation of Just-in-time Production System: Building Blocks and Guiding Principles

Just-in-time production system is originally called Toyota production system and recently called world class manufacturing. The central concept of just-in-time production system is minimization of production wastes which is defined as any thing that does not add value to the end product from the customer's perspective. It includes over production, defects, unnecessary inventory, inappropriate processing, excessive transportation, waiting time, and unnecessary motion. Just-in-time manufacturing tries to smooth the flow of materials from the suppliers to the customers, thereby increasing the speed of the manufacturing process. It seeks to achieve the goals of zero defects, zero set-up time, zero inventories, zero handling, zero lead-time, and a lot size of one . With just-in-time production system we get a view on total manufacturing picture. This book addresses the implementation of just-in-time production system concepts to both discrete production system and continuous production process with case analysis.

Media Boeken     Paperback Book   (Boek met zachte kaft en gelijmde rug)
Vrijgegeven 24 maart 2012
ISBN13 9783848448791
Uitgevers LAP LAMBERT Academic Publishing
Pagina's 144
Afmetingen 150 × 9 × 225 mm   ·   222 g
Taal en grammatica Engels  

Alles tonen

Meer door Temesgen Garoma